Lone Worker Protection System Daresbury Site Coverage
03 Dec 2013
Yes
-  

 

 

SBES LifeSaver Lone Worker Protection System Site Coverage

No

​​

 

The Lone Worker system is currently operational in the following areas on the Daresbury site.

  • A Block
  • B Block (includes Amenity Area Ground Floor only)
  • C Block
  • D Block (ex-SRS workshop area only)
  • Hartree Building
  • Experimental Halls
    • Zone 1 (Electron Hall East, Electron Hall West, Wiggler Compressor House)
    • Zone 2 (CLARA)
    • Zone 3 (Storage ring​)
    • Zone 4 (Inner Hall East, Inner Hall West, Gantry)
    • Zone 5 (Ring Tunnel Ground Floor, L Block Ground & 1st Floor)
    • Zone 6 (Ring Tunnel Basement)
    • Zone 14 (Water Treatment and Tunnel)
  • HPC external enclosure and compound (registers as Outer Hall)
  • ITAC-Bio (registers as Outer Hall)
  • Plant Room 1 & 11kV Main Switchroom (registers as Plant Room 1)
  • Plant Room 2 (registers as Outer Hall)
  • Security Reception
  • SuperSTEM
  • T Block (Zones C, D, E, F, H, I J, K & H)
  • T Block MEIS Area
  • T Block Ground Floor Labs
  • T9 (Nuclear Physics Computing)
  • VELA Control Room
Contact: Baker, Gareth (STFC,DL,COO)